Trade 10 · Excavation & Site Preparation

Excavation, Demolition & Site Preparation

Careful removal, access planning, excavation and base preparation that set the project up correctly.

What We Build

Sub-services

The groundwork that every build stands on

01

Demolition & Removal

Removing old patios, walks, decks, walls, lawn or planting that are in the way of the new work.

02

Excavation

Digging to the depth and shape the design calls for.

03

Grading

Shaping the site so surfaces slope to drain and elevations match the plan.

04

Base Preparation

Compacting subgrade and base material so the finished surface stands on firm ground.

05

Access Planning & Staging

Planning how equipment, material and spoils move through the property.

06

Spoils & Haul-Away

Deciding what soil stays on site, what is reused and what leaves.

Why It Matters

Excavation & Site Preparation

Get the ground right and the rest follows

Most outdoor construction problems trace back to the ground: soft spots, trapped water, poor compaction or surprises under the surface. Careful preparation prevents those.

Site preparation is also where scope gets decided. What is under the old surface, how tight the access is and where the water goes can all change what a project needs, which is why we assess before we price.

What good looks like

  • Underground utilities are located before digging.
  • Existing surfaces and spoils are planned for before work starts.
  • Subgrade is checked and compacted before base material goes in.
  • Final grades slope away from the house and toward the drainage plan.

Design Options

Make it yours

Planning choices before the first cut

Access

Equipment & Material Routes

Gate widths, slopes and obstacles decide what equipment can be used and how material is moved.

Spoils

Reuse or Haul Away

Soil can sometimes be reused for grading; the rest must be hauled away.

Protection

Protecting Trees, Lawn & Structures

Tree roots, lawn and existing structures can be fenced, protected or planned around.

Grades

Elevations & Slopes

Finish levels, steps and drainage slopes are set so the project fits the property.

Sequencing

Order of Work

Groundwork is sequenced with other trades so access is not blocked or finished work is not disturbed.

Materials

Suppliers & collections

How We Build It

6 Steps

How site preparation is done

  1. Utility Locate & Site Walk

    We confirm utility locations before digging and walk the site to mark limits, access and what stays.

  2. Protection & Staging

    Trees, lawn, structures and routes are protected and a staging area is set.

  3. Demolition & Removal

    Old surfaces and materials are removed and sorted for haul-away or reuse.

  4. Excavation

    We dig to the planned depth and shape, checking the soil as we go.

  5. Grading & Subgrade Preparation

    The subgrade is shaped to drain and compacted so it is firm and uniform.

  6. Base Placement & Handoff

    Base material is placed and compacted, then the area is ready for the build trade.

Warranty & Credentials

What stands behind the work

Workmanship coverage and credentials are confirmed in writing with your proposal.

What Affects the Cost

Factors, not prices

What affects the cost of site preparation

01

Area & depth

Larger and deeper excavations mean more machine time and spoils.

02

What is being removed

Concrete, old decks, walls and roots take more effort to demolish and haul.

03

Access

Narrow gates, slopes and long carries affect equipment and labor.

04

Soil conditions

Wet, rocky or unstable soil can change what is needed.

05

Spoils

Hauling and disposal of material is a variable in the scope.

06

Base & grading requirements

The needs of the build above set the base and grading scope.

Every property is different. After we assess yours, your proposal sets out the written scope, options and pricing assumptions.

FAQ

Excavation & Site Preparation

Do you check for utilities before digging?

Yes. Underground utilities are located before excavation, and we plan around what is found. In Washington, calling 811 is the standard way to request a locate.

Can you work in tight access?

Often, yes. Smaller equipment and hand work can be used, though tight access can affect labor and scope. We assess access during the property review.

What happens to the soil and old materials?

We plan what can be reused on site and what must be hauled away, and we describe that in your proposal.

Can you remove an old patio, deck or wall?

Yes. Demolition and removal are part of our scope when they are needed for the new project.

What does site preparation cost?

Area, depth, what is removed, access, soil and spoils all play a role. Your written proposal sets out the scope and pricing after the assessment.

Let us build the space you have been planning

Tell us what you want to change and any materials that have caught your eye. We will help you understand the right next step.